The latest file on the eastern hoist records that the first implementation notes have been compared with the promise in the minutes. The existing rule remains in force; officials have not announced a permanent change.
Dori Tharn, rope examiner for the east hoist, said the latest file records 24 test lifts completed under load, compared with 22 in the previous count. The figures cover the entries on the register, not every condition at the site.
The examiner has found no failed fibers; the crew argues that a rope can pass a bench test and still behave badly under a stop. The current record does not settle that disagreement. At the latest public table, residents asked the clerk to keep their account beside the source count. No final finding has been issued.
Dara Vek checked the rope fiber samples and the hoist’s load-and-stop book against the field notes. The method is to start at the shift handoff, where an official total can lose its context; it confirms the entries, but not every interpretation attached to them. The docket is marked EASTERN-HOIST-05, and the next check is assigned to a second crew.
The next trial will record a full stop with a stone load matched to the heaviest routine cart. Until that check is complete, the schedule already in force continues to govern.
