Q: What changed in the public comment close review?
Teren Bel: The responsible office has offered a limited remedy with an end date for review. That changes what is in the file; it does not, by itself, change the rule.

Q: Which entry should residents look at first?
Teren Bel: the stone-load register and the night watch’s closure notices. This cycle records 19 loaded crossings, against 19 in the last count. The dates and the method matter as much as the total.

Q: Why is there still a disagreement?
Teren Bel: The inspector’s limit protects the oldest span; carriers say the alternate route adds a full stair and a second toll. We have not found a single measure that answers both accounts.

Q: What will the next check tell you?
Teren Bel: The masons will place a temporary measure stone before authorizing the next heavy load. If it is recorded by another crew, we can see whether the first result was about the method or about the place.

Q: What should the public not infer yet?
Teren Bel: That a lower or higher count settles whether the fourth arch can carry trade carts while repair stones are brought up the same road. It tells us what was entered, not who should carry the cost.