Lantern Fault returns to the public table: field review
A new step in lantern fault: A new complaint or proposal has been entered under a dated docket. The current rule remains in place.
From the halls. Across the realms.
A QSN investigation
Mine safety, maintenance and the practical knowledge carried between underground crews.
992 chapters · Follow the reporting in order
Filed June 5, 2031 · Labor & Industry
A new step in lantern fault: A new complaint or proposal has been entered under a dated docket. The current rule remains in place.
Filed June 5, 2031 · Labor & Industry
The file on south ventilation line compares the fan register and the handwritten checks at each junction with the rule used at the South Ventilation Line beside the old ore pass. Here is what the latest step changes.
Filed June 6, 2031 · Labor & Industry
Gevra Sol, geology reader assigned to the east crews, explains why 37 lamp readings taken at the marked stations do not settle the question raised at the Lantern Fault below the east water gallery.
Filed June 7, 2031 · Labor & Industry
A new step in east seam: The clerk has matched the claim to its source register and named the missing record. The current rule remains in place.
Filed June 9, 2031 · Labor & Industry
The field review review marks another point in the eastern hoist record, from its first notice to the current test.
Filed June 12, 2031 · Labor & Industry
The field review review marks another point in the south ventilation line record, from its first notice to the current test.
Filed June 12, 2031 · Labor & Industry
The file on lantern fault compares the fault map, lamp checks and a sealed bag of recovered stone chips with the rule used at the Lantern Fault below the east water gallery. Here is what the latest step changes.
Filed June 13, 2031 · Labor & Industry
Uldra Ker, shift foreman on the east face, explains why 25 soundings recorded before entry do not settle the question raised at the East Seam, four galleries below the old cart rail.
Filed June 17, 2031 · Labor & Industry
Dori Tharn follows the rope fiber samples and the hoist’s load-and-stop book at the eastern hoist chamber above the deep cart line as the grain fall shift reaches its next decision.
Filed June 18, 2031 · Labor & Industry
A dated status note on south ventilation line: current evidence, the unresolved objection and the next public date.
Filed June 19, 2031 · Labor & Industry
The field review review marks another point in the lantern fault record, from its first notice to the current test.
Filed June 20, 2031 · Labor & Industry
The file on east seam compares the soundings book and the crew’s pre-entry inspection cards with the rule used at the East Seam, four galleries below the old cart rail. Here is what the latest step changes.
Filed June 20, 2031 · Labor & Industry
A dated status note on lantern fault: current evidence, the unresolved objection and the next public date.
Filed June 21, 2031 · Labor & Industry
The field review review marks another point in the east seam record, from its first notice to the current test.
Filed June 23, 2031 · Labor & Industry
The latest confirmed step is that a second set of hands has checked the count and recorded where the methods differ. Next: The next trial will record a full stop with a stone load matched to the heaviest routine cart.
Filed June 24, 2031 · Labor & Industry
Kora Ennet follows the fan register and the handwritten checks at each junction at the South Ventilation Line beside the old ore pass as the grain fall shift reaches its next decision.
Filed June 25, 2031 · Labor & Industry
In the field review file, the eastern hoist rule turns on who carries its cost. The record includes 42 test lifts completed under load; the harder question is whether the rule can be checked in the eastern hoist chamber above the deep cart line.
Filed June 26, 2031 · Labor & Industry
The latest confirmed step is that the responsible office has offered a limited remedy with an end date for review. Next: A loaded test will be repeated with the return door fitted to its replacement hinge.
Filed June 27, 2031 · Labor & Industry
Gevra Sol follows the fault map, lamp checks and a sealed bag of recovered stone chips at the Lantern Fault below the east water gallery as the grain fall shift reaches its next decision.
Filed June 27, 2031 · Labor & Industry
A dated status note on east seam: current evidence, the unresolved objection and the next public date.
Filed July 1, 2031 · Labor & Industry
At the eastern hoist chamber above the deep cart line, Dori Tharn works through the deep winter routine around the eastern hoist. This installment follows the file from the first mark to the people who rely on it.
Filed July 2, 2031 · Labor & Industry
In the field review file, the south ventilation line rule turns on who carries its cost. The record includes 30 air checks entered per shift; the harder question is whether the rule can be checked in the South Ventilation Line beside the old ore pass.
Filed July 3, 2031 · Labor & Industry
The latest confirmed step is that the affected crew has tried the revised procedure under ordinary working conditions. Next: The crew will hold the face while a remote lamp is lowered beyond the fourth marker.
Filed July 4, 2031 · Labor & Industry
Uldra Ker follows the soundings book and the crew’s pre-entry inspection cards at the East Seam, four galleries below the old cart rail as the deep winter shift reaches its next decision.
Filed July 5, 2031 · Labor & Industry
The latest confirmed step is that a public vote has approved a narrow change while leaving the larger question open. Next: A second surveyor will repeat the readings from the opposite wall.
Filed July 8, 2031 · Labor & Industry
A comparison of the rope fiber samples and the hoist’s load-and-stop book finds what the field review count can establish and what remains absent from the public summary.
Filed July 8, 2031 · Labor & Industry
At the South Ventilation Line beside the old ore pass, Kora Ennet works through the deep winter routine around the south ventilation line. This installment follows the file from the first mark to the people who rely on it.
Filed July 9, 2031 · Labor & Industry
In the field review file, the lantern fault rule turns on who carries its cost. The record includes 18 lamp readings taken at the marked stations; the harder question is whether the rule can be checked in the Lantern Fault below the east water gallery.
Filed July 10, 2031 · Labor & Industry
A comparison of the fan register and the handwritten checks at each junction finds what the field review count can establish and what remains absent from the public summary.
Filed July 11, 2031 · Labor & Industry
At the Lantern Fault below the east water gallery, Gevra Sol works through the deep winter routine around the lantern fault. This installment follows the file from the first mark to the people who rely on it.
Filed July 12, 2031 · Labor & Industry
In the field review file, the east seam rule turns on who carries its cost. The record includes 67 soundings recorded before entry; the harder question is whether the rule can be checked in the East Seam, four galleries below the old cart rail.
Filed July 14, 2031 · Labor & Industry
A new step in eastern hoist: The first implementation notes have been compared with the promise in the minutes. The current rule remains in place.
Filed July 15, 2031 · Labor & Industry
Dori Tharn, rope examiner for the east hoist, explains why 9 test lifts completed under load do not settle the question raised at the eastern hoist chamber above the deep cart line.
Filed July 16, 2031 · Labor & Industry
A new step in south ventilation line: The docket has returned for review with the exceptions and unresolved objections attached. The current rule remains in place.
Filed July 17, 2031 · Labor & Industry
A comparison of the fault map, lamp checks and a sealed bag of recovered stone chips finds what the field review count can establish and what remains absent from the public summary.
Filed July 18, 2031 · Labor & Industry
At the East Seam, four galleries below the old cart rail, Uldra Ker works through the deep winter routine around the east seam. This installment follows the file from the first mark to the people who rely on it.
Filed July 22, 2031 · Labor & Industry
The file on eastern hoist compares the rope fiber samples and the hoist’s load-and-stop book with the rule used at the eastern hoist chamber above the deep cart line. Here is what the latest step changes.
Filed July 23, 2031 · Labor & Industry
Kora Ennet, ventilation mechanic on the south shift, explains why 10 air checks entered per shift do not settle the question raised at the South Ventilation Line beside the old ore pass.
Filed July 23, 2031 · Labor & Industry
A new step in lantern fault: A new complaint or proposal has been entered under a dated docket. The current rule remains in place.
Filed July 24, 2031 · Labor & Industry
A comparison of the soundings book and the crew’s pre-entry inspection cards finds what the midyear count count can establish and what remains absent from the public summary.
Filed July 25, 2031 · Labor & Industry
Gevra Sol, geology reader assigned to the east crews, explains why 59 lamp readings taken at the marked stations do not settle the question raised at the Lantern Fault below the east water gallery.
Filed July 26, 2031 · Labor & Industry
A new step in east seam: The clerk has matched the claim to its source register and named the missing record. The current rule remains in place.
Filed July 28, 2031 · Labor & Industry
The midyear count review marks another point in the eastern hoist record, from its first notice to the current test.
Filed July 29, 2031 · Labor & Industry
The file on south ventilation line compares the fan register and the handwritten checks at each junction with the rule used at the South Ventilation Line beside the old ore pass. Here is what the latest step changes.
Filed July 30, 2031 · Labor & Industry
The midyear count review marks another point in the south ventilation line record, from its first notice to the current test.
Filed July 31, 2031 · Labor & Industry
The file on lantern fault compares the fault map, lamp checks and a sealed bag of recovered stone chips with the rule used at the Lantern Fault below the east water gallery. Here is what the latest step changes.
Filed August 1, 2031 · Labor & Industry
Uldra Ker, shift foreman on the east face, explains why 47 soundings recorded before entry do not settle the question raised at the East Seam, four galleries below the old cart rail.
Filed August 3, 2031 · Labor & Industry
A dated status note on eastern hoist: current evidence, the unresolved objection and the next public date.
Filed August 5, 2031 · Labor & Industry
Dori Tharn follows the rope fiber samples and the hoist’s load-and-stop book at the eastern hoist chamber above the deep cart line as the deep winter shift reaches its next decision.
Filed August 6, 2031 · Labor & Industry
A dated status note on south ventilation line: current evidence, the unresolved objection and the next public date.
Filed August 7, 2031 · Labor & Industry
The midyear count review marks another point in the lantern fault record, from its first notice to the current test.
Filed August 7, 2031 · Labor & Industry
The file on east seam compares the soundings book and the crew’s pre-entry inspection cards with the rule used at the East Seam, four galleries below the old cart rail. Here is what the latest step changes.
Filed August 9, 2031 · Labor & Industry
The midyear count review marks another point in the east seam record, from its first notice to the current test.
Filed August 11, 2031 · Labor & Industry
The latest confirmed step is that a second set of hands has checked the count and recorded where the methods differ. Next: The next trial will record a full stop with a stone load matched to the heaviest routine cart.
Filed August 12, 2031 · Labor & Industry
Kora Ennet follows the fan register and the handwritten checks at each junction at the South Ventilation Line beside the old ore pass as the deep winter shift reaches its next decision.
Filed August 13, 2031 · Labor & Industry
A dated status note on lantern fault: current evidence, the unresolved objection and the next public date.
Filed August 14, 2031 · Labor & Industry
Gevra Sol follows the fault map, lamp checks and a sealed bag of recovered stone chips at the Lantern Fault below the east water gallery as the deep winter shift reaches its next decision.
Filed August 15, 2031 · Labor & Industry
A dated status note on east seam: current evidence, the unresolved objection and the next public date.
Filed August 18, 2031 · Labor & Industry
In the midyear count file, the eastern hoist rule turns on who carries its cost. The record includes 64 test lifts completed under load; the harder question is whether the rule can be checked in the eastern hoist chamber above the deep cart line.
Filed August 18, 2031 · Labor & Industry
The latest confirmed step is that the responsible office has offered a limited remedy with an end date for review. Next: A loaded test will be repeated with the return door fitted to its replacement hinge.